![](https://images.squarespace-cdn.com/content/v1/6130f570601aee3c6360bf31/4cd24797-b4a5-4330-aa7e-11125a392aa9/recover-green-roofs-hingham-mbta-2016-15.jpg)
Hingham Ferry
Hingham, MA
Hingham MBTA Ferry Terminal
Location
Hingham, MA
Size
4,000 sq. ft.
Project Completion
April 2016
STORMWATER MANAGEMENT
The Hingham Intermodal Center is a transportation facility located in the historic Hingham Shipyard adjacent to a mixed-use development featuring residences, offices, retail, entertainment, and recreational spaces.
Recover installed a 4,500-square-foot, drought-tolerant sedum mat system on two adjacent roofs of the Intermodal Center, designed to reduce stormwater runoff and improve building performance. Overlooking Hingham Bay and a large commuter parking lot, this green roof performs an important job by creating pervious surface for water to filter through before running into the bay.
PROJECT INFORMATION
-
LM Heavy Civil
-
Extensive
-
Sedum
-
MBTA
-
Recover Green Roofs
-
Firestone
-
Firestone PVC
-
Titan Roofing
-
Firestone